By May 23, 2019 0 Comments Read More →

Design And Maintenance : Gas, Oil And Water Pipeline

GAS, OIL AND WATER PIPELINE DESIGN AND MAINTENANCE

Bandung | 18 – 21 Juni 2019 | Rp. 8.950.000 Per Peserta
Bandung | 30 Juli – 02 Agustus 2019 | Rp. 8.950.000 Per Peserta
Bandung | 20 – 23 Agustus 2019 | Rp. 8.950.000 Per Peserta
Bandung | 17 – 20 September 2019 | Rp. 8.950.000 Per Peserta

Jadwal Training 2019 Selanjutnya …

 

 

DESIGN AND MAINTENANCE : GAS, OIL AND WATER PIPELINE  INTRODUCTION :

To fulfill the oil and gas demand for power generation, recovery processes, and other uses, pipelines are utilized to transport the supply from their source.  These pipelines are mostly buried and operate without disturbing normal pursuits.

Construction procedures for most pipeline systems can be adapted to consider specific environmental conditions and are tailored to cause minimal impact on the environment.

Unattended pumping stations move large volumes of oil and petroleum products under high pressure.  Many factors have to be considered in the engineering and design of long-distance pipelines, including the nature and volume of fluid to be transported, the length of pipeline, the types of terrain traversed and the environmental constraints.  Major factor influencing pipeline system design are: Fluid properties, design condition, supply and demand magnitude/location, Code and standards, Route, topography and access, environmental impact, economic, hydrological impact, seismic and volcanic impacts.

To obtain optimum results for a pipeline transmission system, complex economic and engineering studies are necessary to decide on the pipeline diameter, material, compression/pumping power requirements and location of the pipeline route.

 

DESIGN AND MAINTENANCE : GAS, OIL AND WATER PIPELINE TRAINING MATERIAL OUTLINE

  1. Overview of Problems in Gas, Oil and Produced Water Pipeline Operations and Maintenance
  2. The Pipeline Design Approach and Considerations
  3. Design of Gas Transmission Pipeline
  4. Design of Crude, Oil and Produced Water Transportation Pipeline
  5. Valves, Flanges and Fittings Selection for Crude, Oil, Gas and Produced Water Pipeline Design

 

INSTRUCTOR :   Ir. Hilman Ahmad,DCE. and Associates

 

VENUE :   Bandung (Golden Flower, Banana Inn, Serela, Gino Feruci), Amaroossa Hotel, Noor Hotel, Grand Setiabudi Hotel, dll

 

TRAINING DURATION :   4 days

 

JADWAL TRAINING 2019

  1. 18 Jun 2019-21 Jun 2019
  2. 30 Jul 2019-02 Agust 2019
  3. 20 Agust 2019-23 Agust 2019
  4. 17 Sep 2019-20 Sep 2019
  5. 29 Okt 2019-01 Nop 2019
  6. 19 Nop 2019-22 Nop 2019
  7. 02 Des 2019-05 Des 2019

 

INVESTMENT PRICE/PERSON :

  1. Rp 8.950.000/person (full fare) or
  2. Rp 8.750.000/person (early bird, payment 1 week before training) or
  3. Rp 8.500.000/person (if there are 3 or more participants from the same company)

 

FACILITIES FOR PARTICIPANTS :

  1. Training Module
  2. Flash Disk contains training material
  3. Certificate
  4. Stationeries: NoteBook and Ballpoint
  5. T-Shirt
  6. Backpack
  7. Training Photo
  8. Training room with full AC facilities and multimedia
  9. Lunch and twice coffeebreak everyday of training
  10. Qualified instructor
  11. Transportation for participants from hotel of participants to/from hotel of training (if minimal number of participants from one company is 4 persons)

 

Formulir Permintaaan Informasi Lanjutan / Pra-Pendaftaran Public Training
  1. INFORMATION OPTIONS
  2. (required)
  3. PERSONAL DATA
  4. (valid email required)
  5. PRE REGISTRATION DATA (Tidak Mengikat)
  6. MESSAGE FOR TRAINING PROVIDER
 

Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • MisterWong
  • Y!GG
  • Webnews
  • Digg
  • del.icio.us
  • StumbleUpon
  • Reddit

About the Author:

Post a Comment