The objective of this course is to present the factors involved in operation of the gas turbine generating unit, including typical procedures for start-up and shut-down of the unit. On-load operation is discussed with particular emphasis on operating hazards and limitation. The course generally focuses on the heavy industrial type gas turbine.

MATERI

  • Objectives of operating maneuvers
  • Auto/manual operation
  • Start-up prerequisites
  • Auxiliary systems required for start-up
  • Turning gear
  • Starting device and torque convertor
  • “Break away” and speed adjustment
  • Necessity for unit purge
  • Ignition and light-off
  • Speed control to synchronization
  • Start-up curve
  • Minimum load setting
  • Change over from start-up to operating conditions
  • Permissible rate of loading
  • Base load and peak load (overload)
  • Governor control, speed droop characteristic
  • Exhaust temperature control (override)
  • Procedure for shutdown
  • Need for even cooling
  • Spin cooling; turning gear
  • Operating hazards; mechanical, thermal, combustion
  • Overspeed
  • Bearing failures
  • Vibration detectors
  • Mechanical unbalance
  • Turbine blade deposits
  • Thermal unbalance, distortion, misalignment
  • Conditions required for combustion
  • Effects of overfiring
  • Loss of ignition, explosion
  • Accumulation of unburned carbon
  • Need for complete monitoring and control system
  • Case Studies




INSTRUKTUR

Teguh Santoso ST, MT
Expert in Gas Turbin & Power Plant



WAKTU & TEMPAT

  • 17-19 April 2012                      : Hotel Scarlet Dago – Bandung
  • 11-13 September 2012           : Hotel Harris Tebet – Jakarta
  • 11-13 Desember 2012             : Hotel Ibis – Semarang


METODE
Presentation, Discussion, Case Study, Evaluation, Post-Test & Pre-Test



FASILITAS

Certificate, Training Kit, Module / Handout, Lunch, Coffee Break, Souvenir



PESERTA

Power plant managers, supervisors, and engineers, Suppliers of Turbine – Generator components and services

INVESTASI

  • Rp. 6.500.000,- / orang (Non-Residential)
  • Rp. 5.500.000,- / orang (Non-Residential), minimum 2-3 peserta

 

 

Share and Enjoy: These icons link to social bookmarking sites where readers can share and discover new web pages.
  • MisterWong
  • Y!GG
  • Webnews
  • Digg
  • del.icio.us
  • StumbleUpon
  • Reddit

About the Author:

Post a Comment